Detailed engineering survey, cadastral mapping, soil testing, departmental permissions for 600 Km IOCL pipe line route – Durgapur to Barauni (via Masudanpur), Gidha (Patna) – Muzzaffarpur, work is under completion stage, through substantial work had been completed for detailed engineering and soil testing.
Services Provided
River hydrological data collection/ generation
Cadastral Survey
Technical Report Preparation
Topographical survey at station locations
Geotechnical investigation at Station locations and HDD crossing locations
Providing services for establishing Right of User (ROU) in Right of Way (ROW)
under P&MP Act, 1962
Obtaining approvals/ permissions from the respective State/ Central and other
Statutory Authorities
Reconnaissance Survey
Detailed Engineering Survey
Population Density Index Survey
Soil Resistivity Survey
Soil Chemical Analysis Survey
Soil Stratification Survey
Data Generation Survey
Providing support services for forest clearance under Forest Conservation Act
1980 and Forest Right Act 2006
Providing Services related to opening of Right of Way (ROW) and other activities
for the entire final proposed pipeline