Projects Categories: Urban Planning

Survey of unauthorized colonies
May 27, 2021 /

The government of Rajasthan took initiatives to regularize construction on agricultural land and give than the legal land title. The firm has assigned the work of 8 towns of Rajasthan viz. Sikar, Rawatsar, Pali, Kekri, Jhunjhnu, Bisau, Ajmer, Vijay nagar.

Services Provided

  • Total station survey of all unauthorized development
  • Documentation of all details
  • Providing proper legal land title
Village Development Plan Rajasthan
May 27, 2021 /

A majority of the villages in the state of Rajasthan still face constraints such as access to education, health facilities, drinking water, power, roads, credit, information, and market. Against this background, the Government of Rajasthan intends to prepare the Village Development Plan (VDP) which would go a long way in ensuring holistic and integrated development of the concerned villages. Firm assigned work of preparation of GIS-based Master Plan of action of 5 Villages of Rajasthan viz. Chhapoli, Malsisar, GudharGorji, Mandrella, Sultana.

Services Provided

  • Physical Survey and Base map on 1:4000 scale
  • Collection and digitization of Revenue Maps
  • Preparation of existing land use
  • Collection and Analysis of Socio-Economic Data
  • Population Projection
  • Superimposed digitization of Khasra maps on existing Land use map
  • Infrastructure assessment
  • Preparation of Proposal Plan
Street Vending Plan
May 27, 2021 /

11 towns in the State of Rajasthan, were allotted for the preparation of the street vending plan. The town namely Sri Ganganagar, Bikaner, Hanumangarh, Sikar, Jhunjhunu, Kishangarh, Ajmer, Beawar, Bhilwara, Sawai Madhopur, and Udaipur were taken up, and a draft vending plan of all cities submitted for TVC approval, vendors survey and their vending cards prepared for each town as desired by concern MC’s.

Services Provided

  • Submission of the inception report
  • Vendor Identification, Bio-metric survey, capturing photographs, vendor census survey, and GIS mapping of the existing Vendors
  • Draft Vending Plan
  • Final Street Vending Plan (Approved by Concerned Municipal Council)
  • Provision of web base survey for review and monitoring of Survey (for l year)
Prithavi Raj Nagar Yojana, Jaipur
May 27, 2021 /

Prithvi Raj Nagar Yojana is the biggest scheme of Jaipur Development Authority (JDA), on the privately acquired land. For the last 22 years, PRN Yojana is under dispute and the matter of acquisition has been prejudiced by the court, JDA has never succeeded in having the real physical possession of the acquired land at the site, in lieu of which the unauthorized settlement has been started to develop. The main purpose of the study is: To prepare a Detailed Project Report for Prithvi Raj Nagar Yojana and to Create A – grade facilities and infrastructure for the planned growth of the region within the place of Jaipur City Development Plan.

Services Provided

  • Total Station Survey
  • Demarcation of roads network and alignment of roads
  • Designing of Drainage Network
  • Designing of Sewerage, water supply, road, and other physical & social infrastructure components.
Preliminary Feasibility Project Report for ROBs
May 27, 2021 /

YCSPL was appointed as the design consultant by Road Infrastructure Development Company of Rajasthan Limited (RIDCOR) for Preliminary Feasibility Project Report for RoB at LC nos. 232, 233, 234 & 110.

Services Provided

  • Survey & Investigations
  • Finalise proposals for improvements and widening
  • Preparation of GAD
  • Detailed Engineering & Design as per NHAI stipulations and specifications
Layout plan for regularization of slums in Suratgarh
May 27, 2021 /

The government of Rajasthan took the initiative to regularize all unauthorized slums in Suratgarh Municipality limits under Project “Prashasan Sheron Ke Sangh”. Under this project, a total station survey and detailed socio-economic survey of all slum dwellers residing in unauthorized areas have been done.

Services Provided

  • Detailed Total Station Survey of all unauthorized slums in Suratgarh town
  • Detail Socio-economic survey of slums
  • Preparation of tenure file of all slum residents
  • Detailed mapping of all unauthorized slums
  • Superimposition of plan on city master plan
IOCL Pipeline Project
May 27, 2021 /

Detailed engineering survey, cadastral mapping, soil testing, departmental permissions for 600 Km IOCL pipe line route – Durgapur to Barauni (via Masudanpur), Gidha (Patna) – Muzzaffarpur, work is under completion stage, through substantial work had been completed for detailed engineering and soil testing.

Services Provided

  • River hydrological data collection/ generation
  • Cadastral Survey
  • Technical Report Preparation
  • Topographical survey at station locations
  • Geotechnical investigation at Station locations and HDD crossing locations
  • Providing services for establishing Right of User (ROU) in Right of Way (ROW)
    under P&MP Act, 1962
  • Obtaining approvals/ permissions from the respective State/ Central and other
    Statutory Authorities
  • Reconnaissance Survey
  • Detailed Engineering Survey
  • Population Density Index Survey
  • Soil Resistivity Survey
  • Soil Chemical Analysis Survey
  • Soil Stratification Survey
  • Data Generation Survey
  • Providing support services for forest clearance under Forest Conservation Act
    1980 and Forest Right Act 2006
  • Providing Services related to opening of Right of Way (ROW) and other activities
    for the entire final proposed pipeline

 

IOCL Digital Map

Housing for All Plan of Action
May 27, 2021 /

Firm assigned work of preparation of housing for all plan of action of entire 80 towns of the Haryana state, under 4 clusters i.e. Hisar, Rohtak, Ambala, and Gurgaon. Assignment mainly includes demand survey (using a mobile map with geo-tracking mechanism) of all beneficiaries, their D2D validation, socio-economic analysis and data, stakeholders meeting, computerization of survey data, preparation of HFAPoA using step by step process, preparation of project reports (DPRs) for Affordable Housing (Pvt. Land) and BLC (E) and BLC (N) verticals, for approx. more than 2.25 lac beneficiaries of the 80 towns. HFAPoA & DPRs have been approved by SLSMC of State and CSMC, GoI. Similarly, 7 towns HFAPoA of Rajasthan State is under progress.

Services Provided

  • Demand Survey
  • Organize City Level Workshops for Stakeholders
  • Assessment of Present Status of Slums
  • Formulation of Slum Intervention Strategies
  • Estimation of Urban Poor Housing Shortage & Identifying Supply and Demand Constraints.
  • Identifying Supply and Demand Side Reforms and Framing Future Supply Strategy.
  • Framing Investment Requirements & Financing Plan
  • Finalization of Housing for All Plan of Action (HFAPoA)
GIS Utility Mapping of Faridabad
May 27, 2021 /

GIS base map of Faridabad town was prepared and GIS utility mapping of water supply, sewerage, and drainage carried out, in consultation with each Junior / Assistant Engineers of MCF, of concern zones, work had been completed.

Services Provided

  • Collection of Various Maps & Data from Municipal & Government Agencies.
  • Incorporation of Cadastral Information.
  • Survey and Updating of Base Map.
  • Final Base Map.
  • Procurement of Satellite Imagery.
  • DGPS Survey & Geo Referencing.
  • Ortho rectification of the Satellite Images.
  • Preparation of Base Map and existing Land use Map.
  • Auto Level Survey for Contouring.

GIS Utility Mapping

City Development Plan Rajasthan
May 27, 2021 /

Firm assigned work of preparation of City development plan for the following towns and cities of Rajasthan viz. Ajmer, Pushker, Beawar, Kishangarh and Kekri cities and Jaitaran, Sheoganj, Phalodi and Nokha CDP is more focused towards financing and project implementation. It has been perspective for 5 years. Its main focus is to improve financial conditions of local bodies, ensure investment of funds to fulfill deficiencies in urban infrastructure.

Services Provided

  • City Assessment: Analysis of existing situation
  • Collection of data like population, Slum dwellers, economic base, occupation, Municipal revenue expenditure, State of infrastructure, environmental aspects, land use etc.
  • Objections & Suggestions
  • Meeting the gap between present and future conditions by improving Water Supply systems, Sewerage and solid waste management, Construction and improvement of drains/stormwater drains, Urban transport Laying/improvement /widening of arterial/sub-arterial roads and bridges to remove transport bottlenecks, Laying of ring roads and by-passes around metro and megacities, provided certain cost recovery measures like toll charges, Construction and development of bus and truck terminals, Environmental improvement and city beautification schemes.